Prowna

Your website

He is not buying a slab. He is buying his driveway back.

7 min read

The short answer

Your customer’s real question is not the price. It is how many days he cannot park, cannot get the trash cans out, cannot use his own front door. Nobody answers that in writing. That is the opening.

Two driveways, same street, poured a year apart by two different outfits for prices four thousand dollars apart. Stand on the sidewalk today and you cannot tell which is which. That is the entire problem with selling concrete, and it is why the photograph gallery on your website — the one that took an afternoon to put together — is doing almost nothing for you.

Everything that separates the good slab from the cheap one is buried: what the base was made of, how well it was compacted, whether there is steel in it and where, whether the control joints were cut in time and deep enough. None of it is visible on the day it is finished, and most of it is not visible for three winters. The customer knows this vaguely, which is why he is nervous, and he has no way to check any of it, which is why he falls back on the number at the bottom of the page.

The question he is actually chewing on

Sit in a kitchen while a couple discusses a new driveway and listen to what they actually argue about. It is not the price — that got settled in the first ten minutes. It is logistics. Where does the second car go. How does the trash get to the curb on Tuesday. Can the delivery van still turn around. Is my mother, who uses a walker, going to be able to get to the front door on Sunday.

That conversation is the real obstacle, and it is happening in a room you are not in. Three contractors have quoted. None of the three websites says a single word about any of it. So the couple postpones, because a decision with unknown consequences is easier to postpone than to make, and postponing costs them nothing.

The honest thing that nobody says

Here is where most trade advice would tell you to publish a cure-time chart. Do not, because you cannot stand behind it. There is no universal number for when new concrete takes foot traffic or a car: it moves with the mix, the thickness, the air temperature and what the weather does for the three days afterwards. Anyone printing a confident “72 hours” for every job in every season is printing something they would have to walk back in November.

The only figure that is standardised is the test itself. The American Cement Association puts it plainly: standard practice is to measure compressive strength at 28 days, and concrete keeps gaining strength after that. That is a laboratory milestone, not a homeowner’s permission slip — and the difference between those two things is worth a paragraph on your site, because your competitor is quietly conflating them.

A day-by-day plan of what the household cannot do, with the contractor's own dates filled in and the standardised 28-day test at the end no parking no deliveries walk on it? — your date — park on it? — your date — test strength day 28 POUR WEEK AFTER LATER STANDARD only the last box has a fixed number — the others are yours to fill in per job 28 days is the standard compressive test, not the day he can drive on it
A day-by-day plan of what the household cannot do, with the contractor's own dates filled in and the standardised 28-day test at the end POUR WEEK no parking no deliveries AFTER walk on it? — your date — LATER park on it? — your date — STANDARD test strength day 28 only the last box has a fixed number the others are yours to fill in per job
The plan the household is shopping for. Only the last box has a fixed number; the others are yours to fill in per job.

Which turns the constraint into the offer. You cannot publish one chart for everybody — so publish the promise that they get their own. On the day the concrete goes down, they get a card, or an email, with their dates on it: walk on it after this, put a car on it after this, and here is the number to call if it rains before then. It costs you five minutes per job. It is the only thing on any of the three quotes that sounds like it was written by someone who has done this before.

What goes on the page

The five sections of a concrete job page and what each one settles. Our own reasoning; the 28-day figure is the American Cement Association’s, linked below.
SectionWhat it settles
A week in the life of the job — day by day, in household termsNot “demolition, base, pour, cure”. “Tuesday: the driveway is gone, park on the street, trash goes out front.”
What we need from you before we startCars moved, gate unlocked, dog inside, sprinkler heads flagged. He can read it and know whether he is ready.
The dates card, describedThe promise that he gets his own numbers on pour day, instead of a chart that pretends every slab is the same.
What is under it — with your own photographs of the base, the steel and the joint cutsThe only visible evidence that separates you from the cheap quote, because the finished surface never will.
Weather, said out loudThat a pour gets moved for rain or frost, and that moving it is the responsible answer rather than an excuse. Say it before it happens and it is professionalism; say it after and it is a story.

Read that back and notice what it does that a gallery cannot. It tells him you have thought about his Tuesday. It explains why day two matters without claiming anything he cannot check. It admits, in writing, that concrete cracks — which every homeowner half-knows and every contractor tiptoes around — and then explains that the cuts decide where. And it gives away the weather clause before he has to ask for it.

Why this beats being cheaper

The couple in the kitchen are not choosing between three slabs. They cannot tell three slabs apart and they know it. They are choosing between three levels of certainty about a week of their lives, and only one of the three websites has given them any.

That is also the quiet reason this is worth writing down rather than saying at the door: the person who postpones is not saying no to you, they are saying no to an unknown. Take the unknown away in public, in writing, where they can read it twice at eleven at night without you standing there, and a good share of the postponements stop happening.

Want the website version of all this?

We build it, whole, before you pay anything. You change what you like and decide afterwards.